Skip to main content

Sign In / Enroll

Get rewarded!


4.7 out of 5 stars. 170 reviews
A woman outside with a dog
A woman outside with a dog

Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact

  • Online Only

Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact
4.7170 Reviews

Item # 1531595

Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
$189.99
Neighbor's Club logo
Neighbor’s Club Members earn points with purchases.

Sign in or Join Now

  • Online Only

Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact
4.7170 Reviews

Item # 1531595

Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
Image showing  Adjustable Portable Basketball Hoop, 44 in. Impact
$189.99
financeCard Logo
New Cardmembers earn a $75 Reward with qualifying purchase of $75 or more plus earn 5% in Rewards+ on this purchase. Valid through 5/10/26.Apply now

This item is available online only

Delivering to

37027


Neighbor's Club logo
Neighbor’s Club Members earn points with purchases.

Sign in or Join Now

The Lifetime Impact Frame Portable Basketball Hoop with Telescoping Adjustment the perfect option for beginning and seasoned players alike! with a portable base and a telescoping adjustment from 7.5 to 10 ft., this hoop can be moved to the perfect spot in your yard or driveway for whoever is playing. The backboard is made of UV-protected polyethylene, and will not crack, chip, or peel. Invite friends, new and old, to make great memories together playing with this portable basketball hoop.5-year limited warranty

For additional information on this product, please see the Product Documents section for all downloadable user manuals, installation guides, brochures and warranty statements.

  • All-weather net withstands the elements
  • Classic rim style
  • Fade-resistant graphics give the basketball hoop long-term good looks
  • Heavy-duty portable base allows you to place the basketball hoop just about anywhere
  • Impact backboard won't crack, chip or peel
  • Telescoping adjustment for simple use
  • Made in the USA

Similar Items

  1. Top Rated
  2. Top Rated

Items You May Like

  1. Top Rated
  2. Top Rated

Customers Also Bought

  1. Top Rated
  2. Top Rated

Reviews

Rating Snapshot

Select a row below to filter reviews.
140 reviews with 5 stars.
19 reviews with 4 stars.
3 reviews with 3 stars.
4 reviews with 2 stars.
4 reviews with 1 star.

Overall Rating

4.7
19 out of 19 (100%) reviewers recommend this product

Review this Product

Select to rate the item with 1 star. This action will open submission form.
Select to rate the item with 2 stars. This action will open submission form.
Select to rate the item with 3 stars. This action will open submission form.
Select to rate the item with 4 stars. This action will open submission form.
Select to rate the item with 5 stars. This action will open submission form.
Adding a review will require a valid email for verification
Summary of Reviews
AI-generated from customer reviews, which may include incentivized reviews.
The product is highly praised for its excellent quality and durability. Customers report the item is well-made and has held up well to outdoor use over several years. The overall customer experience i...
Show more
Helpful?

Thank you for your feedback

Your insights help us improve!

You can type a maximum of 250 characters. 0/250 maximum
  • customer service
  • satisfaction
  • purchase
  • price
  • setup
  • speed
  • quality
  • charging
1 to 4 of 170 Reviews .
1 – 4 of 170 Reviews
Omaha, NE
Review 1
Age35 to 44

Great basketball hoop

3 months ago
The finished product is well worth the effort. Hoop is sturdy, good sized and as expected. We filled the base with a polymer gel mixed with water. Holding up great and the kids are already having fun!

Originally posted on lifetime.com

florida
Review 1

KIDS LOVE IT

7 months ago
happy for my kids, now they can play without driving crazy to take them to the park.

Originally posted on lifetime.com

Wisconsin
Review 1
Age45 to 54

Solid Build

10 months ago
Easy installation and self explanatory instructions. Me and me kiddo put together less than 30 mins.

Originally posted on lifetime.com

Alvord, TX
Review 1
Age35 to 44

Easy to assemble

a year ago
Very happy with the quality and super easy to assemble.

Originally posted on lifetime.com