Skip to main content
Sign In / EnrollGet rewarded!
Menu

Search

Home

Sign In

Cart
4.7 out of 5 stars. 176 reviews
A woman outside with a dog
A woman outside with a dog

Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact

Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact

Item # 153159599

Lifetime Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact
Lifetime Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact
$189.99


Add this item to unlock free delivery!

Neighbor's Club logo
Neighbor’s Club Members earn points with purchases.

Sign in or Join Now

Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact

Item # 153159599

Lifetime Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact
Lifetime Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact

$189.99
financeCard Logo
New Cardmembers earn a $50 Reward‡ with qualifying purchase of $50 or more plus earn 5% in Rewards+ on this purchase. Valid through 1/10/27.

Add this item to unlock free delivery!

This item is available online only

Delivery to

Free standard delivery on online footwear & Clothing purchases of $49 and over.


Neighbor's Club logo
Neighbor’s Club Members earn points with purchases.

Sign in or Join Now

The Lifetime Impact Frame Portable Basketball Hoop with Telescoping Adjustment the perfect option for beginning and seasoned players alike! with a portable base and a telescoping adjustment from 7.5 to 10 ft., this hoop can be moved to the perfect spot in your yard or driveway for whoever is playing. The backboard is made of UV-protected polyethylene, and will not crack, chip, or peel. Invite friends, new and old, to make great memories together playing with this portable basketball hoop.5-year limited warranty

For additional information on this product, please see the Product Documents section for all downloadable user manuals, installation guides, brochures and warranty statements.

  • All-weather net withstands the elements
  • Classic rim style
  • Fade-resistant graphics give the basketball hoop long-term good looks
  • Heavy-duty portable base allows you to place the basketball hoop just about anywhere
  • Impact backboard won't crack, chip or peel
  • Telescoping adjustment for simple use
  • Made in the USA

Q&As

No questions have been asked about this product.

No questions have been asked about this product.

Similar Items

  1. Top Rated
  2. Top Rated
  3. Top Rated
  4. Top Rated

Reviews

Rating Snapshot

Select a row below to filter reviews.
145 reviews with 5 stars.
20 reviews with 4 stars.
3 reviews with 3 stars.
4 reviews with 2 stars.
4 reviews with 1 star.

Overall Rating

4.7
19 out of 19 (100%) reviewers recommend this product

Review this Product

Select to rate the item with 1 star. This action will open submission form.
Select to rate the item with 2 stars. This action will open submission form.
Select to rate the item with 3 stars. This action will open submission form.
Select to rate the item with 4 stars. This action will open submission form.
Select to rate the item with 5 stars. This action will open submission form.
Adding a review will require a valid email for verification

Summary of Reviews

AI-generated from customer ratings & reviews, and may include incentivized reviews.
The product is highly praised for its excellent quality and durability. Customers report the item is well-made and has held up well to outdoor use over several years. The overall customer experience is very positive, with the company's responsive and helpful customer service highlighted as a key str...
Show more
Helpful?

Thank you for your feedback

Your insights help us improve!

You can type a maximum of 250 characters. 0/250 maximum
This summary is AI-generated from ratings and reviews across multiple languages.
  • English
  • German
  • French
  • Spanish
  • Portuguese
  • Italian
  • Korean
  • Chinese
  • Japanese
  • Arabic
  • customer service
  • satisfaction
  • purchase
  • price
  • setup
  • speed
  • quality
  • charging
1 to 4 of 176 Reviews .
1 – 4 of 176 Reviews
Utah
Review 1
Age35 to 44

Mighty Hoop!

a month ago
I received the basketball hope very quickly after order placement. My surprise, the box is small, which is a bonus. I am a big fan of being able to put my summer “toys’ away in the shed when winter hits and this packs up super easily. Everything telescopes and goes together again so nicely. Second of all, assembly is super easy. A hot fall day and less than 30 minutes and it was up and ready to go. Which is good, because kids can be impatient when they want to play some hoops. Once put together it was light and easy to move, fill the counterbalance reservoir with water, plug it, and play. Rebounds like a dream, height adjustment, easy peasy. Thoroughly thrilled with this hoop (which is why I stick to Lifetime products). The quality is high and I know this will last a long time. For now we will shoot the hoops until winter hits and then it’ll be time to chase our next lifetime buy, maybe it’ll be sleds next!

Originally posted on lifetime.com

Review 1
Age35 to 44

Great Basketball Hoop

2 months ago
The basketball hoop is great. Normally setting up something big like a basketball hoop can be tricky by yourself. This hoop I could set up by myself. The video included in the instruction book was great. It even showed how to use a table to do the final steps without a second person. The instruction booklet was very helpful; I do recommend the video as well. The video makes it even easier to follow the steps correctly. There is one step that you cannot reverse (it warns you before you complete it). The parts were easy to find, the pictures in the booklet made it easy to find which bolt you need. As far as the product itself, this hoop is great! The quality is great and I think this basketball hoop will last us for years to come! I do want to put in the warning if you use water instead of sand, it says to empty the base before winter. You do not want the water to freeze and expand. I did put in water for now and plan to put sand in it before winter. We were too excited to use it to wait for the sand. I do not worry about it falling over once the base is filled. I could not move it by myself. I had to have someone help me tip it so I could use the wheels. Once I got it tipped to use the wheels, I could easily move it across the driveway. My son has been a huge fan of the computer and TV. Once he was interested in basketball, this was a great tool to help him practice. He is suddenly dribbling balls everywhere and I find him outside shooting hoops often. I am glad the hoop is adjustable as he grows and improves I can move the hoop up until it is official height.

Originally posted on lifetime.com

Grantsville, Utah
Review 1
Age35 to 44

Lifetime 44-Inch Impact® basketball hoop

2 months ago
We have had this hoop for a couple weeks now. It was super easy to setup and all of the tools and parts were easy to decipher on where they went. It took roughly an hour as I had my 13 and 15 year old helping me. We used water in the base and so far it has withstood some significant wind storms. There are two cons that I have about it. The first is the backboard. It is kind of flimsy and the ball doesnt bounce off of it very well. The second is the height adjustment. It takes at least an adult or two teens to lean it down and unscrew the bolt to slide it up or down. Other than that I am very happy with the product.

Originally posted on lifetime.com

Caribou, ME
Review 1
Age35 to 44

Great Product!

2 months ago
The hoop arrived with very detailed instructions along with well labeled parts which made it very simple to put together. It does recommend at least two individuals setup but I was able to put it together by myself in about 1 hour, again very good instructions and labeling! Overall, the hoop is made very sturdy and with water in the base there is little movement when the hoop is in use, making it have a more consistent rebound after each shot allowing you to get more shots up without worrying about the hoop moving around. Whether you are working on layups or jump shots in the yard, this hoop provides the ideal setup to build your skills.

Originally posted on lifetime.com