Lifetime Adjustable Portable Basketball Hoop, 44 in. Impact
$189.99
The Lifetime Impact Frame Portable Basketball Hoop with Telescoping Adjustment the perfect option for beginning and seasoned players alike! with a portable base and a telescoping adjustment from 7.5 to 10 ft., this hoop can be moved to the perfect spot in your yard or driveway for whoever is playing. The backboard is made of UV-protected polyethylene, and will not crack, chip, or peel. Invite friends, new and old, to make great memories together playing with this portable basketball hoop.5-year limited warranty
For additional information on this product, please see the Product Documents section for all downloadable user manuals, installation guides, brochures and warranty statements.
- All-weather net withstands the elements
- Classic rim style
- Fade-resistant graphics give the basketball hoop long-term good looks
- Heavy-duty portable base allows you to place the basketball hoop just about anywhere
- Impact backboard won't crack, chip or peel
- Telescoping adjustment for simple use
- Made in the USA
| Brand | Lifetime |
|---|---|
| Country of Origin | Made in USA |
| Choking Hazard Warning | None |
| Lawn Game Type | Basketball |
| Maximum Number Of Players | 10 |
| Minimum Number Of Players | 1 |
| Number of Pieces Included | 1 |
| Primary Material | Steel |
| Product Height | 7.5 ft. - 10 ft. |
| Product Length | 30 in. |
| Product Weight | 52 lb. |
| Product Width | 44 in. |
| Recommended Age Range | 5 years to 99 years |
| Manufacturer Part Number | 90040 |